Import data from MySQL into Google Sheets
Needs changesNeeds changes. This template uses 1 thing(s) that n8n 3.0 removes: Cron. 1 breaking item(s) found. Static check, last run 2026-10-19.
What to replace before upgrading
| Removed in 3.0 | Replace with |
|---|---|
| Cron Cron | Schedule Trigger |
Nodes used (3)
- Cron
n8n-nodes-base.cron - MySQL
n8n-nodes-base.mySql - Google Sheets
n8n-nodes-base.googleSheets
What it does
This workflow queries a table in MySQL and inserts the data into Google Sheets.